A. The work of this section is integral with the whole of the contract documents and is not intended to be interpreted outside the context.
B. The work of this section is integral with General Conditions of the Contract.
1.02 DESCRIPTION OF WORK
A. The Contractor shall supply, install, test, commission and handover in good operateable manner the diesel generator with 10% overload facility, 1 hr. our every 12 hr. as shown on drawing and B.O.Q. The set shall be complete with diesel engine, generator, control panel, batteries, daily fuel storage tank, fuel transfer pumps and all accessories as mentioned in the B.O.Q and specified here.
1.03 RELATED WORKS SPECIFIED ELSEWHERE
A. Section 16010 : General Provisions for Electrical Installations B. Section 16050 : Basic Materials and Methods C. Section 16060 : Earthing System D. Section 16123 : Wires and Cables E. Section 16130 : Conduits F. Section 16133 : Cable Trays G. Section 16134 : Trunking